Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any commercial rooflight in Brixton, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £1,095 · Supply & fit, per unit; site set-up priced separately

What the job costs in Brixton

Per standard unit

£1,095 – £1,895including VAT at 20%

Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job

Per large unit

£1,895 – £3,345including VAT at 20%

Larger or ventilating units, edge protection in place

Programme of works

£3,345 – £7,195including VAT at 20%

Phased replacement across a building, priced from a survey

Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Brixton and the districts around it, SW9, SE5 and SE24, all sit inside our working area. So does the ground between Brixton and Camberwell (1 mile), and on towards Clapham (1 mile). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

What we do on the day

  • Phasing agreed so occupied areas stay dry and usable
  • Old units removed, with waste taken off site
  • Unit schedule and handover notes for the building's records
  • Fire performance near boundaries — We check how close the rooflights are to the site boundary and to escape routes.
  • Glass or polycarbonate — We compare glass and polycarbonate units against the roof, use and budget.

What happens on the day

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a commercial rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Planning and building rules in England

For non-domestic roofs in England, expect building control involvement for new openings, energy limits of 2.2 W/m²K for rooflights, and fire checks where rooflights sit near a boundary or above an escape route. Smoke ventilation rooflights must be certified products, with controls commissioned by a specialist. We set out what applies to your building on the quote.

Help us quote accurately

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around SW9 and we will come back with a quote or a survey date.

Common questions in Brixton

What if my roof opening is the wrong size for the commercial rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Who is responsible for the smoke-control system?

The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

For a free, no-obligation quote in Brixton, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Commercial rooflights in Brixton

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote