Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Pimlico · SW1V · Greater London

Commercial rooflight installation in Pimlico

Our guide price for commercial rooflight installation starts from £1,095, and the real figure for your roof in Pimlico depends on a handful of things: the size and type of commercial rooflight, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Greater London.

Guide price from £1,095 · Supply & fit, per unit; site set-up priced separately

Guide prices in Pimlico

Per standard unit

£1,095 – £1,895including VAT at 20%

Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job

Per large unit

£1,895 – £3,345including VAT at 20%

Larger or ventilating units, edge protection in place

Programme of works

£3,345 – £7,195including VAT at 20%

Phased replacement across a building, priced from a survey

Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Fitters travel to the job, so the address is what counts. In Pimlico that means postcode districts SW1V, SW1 and SW1P, and the same teams can just as easily take on work in Battersea, about 1 mile away, or Chelsea at roughly 1 mile. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

What we do on the day

  • Roof survey of every unit, kerb and the fragile areas around them
  • New units fitted, sealed and weathered into the roof covering
  • Access, edge protection and fragile-roof covers planned before work starts
  • Glass or polycarbonate — We compare glass and polycarbonate units against the roof, use and budget.
  • Energy limits for non-domestic roofs — We check new units against the energy limits for non-domestic buildings.

From arrival to clean-up

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a commercial rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Regulations for Pimlico properties

On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.

Details that speed up your quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SW1V or nearby, confirms travel.

Common questions in Pimlico

Does commercial rooflight work need building control?

Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

How long does fitting take?

Fitting a commercial rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Send a few photos and your SW1V postcode, and we will put together a written quote for the job.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Commercial rooflights in Pimlico

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote