Guide prices in Devon
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Devon
Builders and roofers working in Devon can use us for the rooflight element of a job, wherever the site is in England. Homeowners can book us directly. In both cases the fitters come to the address, the work follows the maker's instructions, and a written quote fixes the price first. Fitting is carried out by vetted teams under S&K's direction.
- Smoke vents (AOV) in Barnstaple
- Smoke vents (AOV) in Bideford
- Smoke vents (AOV) in Brixham
- Smoke vents (AOV) in Exeter
- Smoke vents (AOV) in Exmouth
- Smoke vents (AOV) in Heavitree
- Smoke vents (AOV) in Newton Abbot
- Smoke vents (AOV) in Paignton
- Smoke vents (AOV) in Plymouth
- Smoke vents (AOV) in Plymstock
- Smoke vents (AOV) in Tiverton
- Smoke vents (AOV) in Torquay
Included in the work
- Controls, detection and wiring handled by the smoke-control specialist
- Upstand checked, adapted or rebuilt to the vent maker's drawing
- New vent fitted, sealed and weathered into the roof
- Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
- Free area at the stair head — We check the free area the vent must provide before choosing a replacement.
Rules that apply in England
A replacement smoke vent in England has to keep the free area and performance the building's fire strategy relies on, using a vent certified to BS EN 12101-2 with its actuator and backup power. We fit the vent and do the roof work; a smoke-control specialist connects and commissions the controls, and we confirm whether building control needs to be notified.
Common questions in Devon
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
Will my new smoke vent rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

