Guide prices in Dorset
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Dorset
Builders and roofers working in Dorset can use us for the rooflight element of a job, wherever the site is in England. Homeowners can book us directly. In both cases the fitters come to the address, the work follows the maker's instructions, and a written quote fixes the price first. Fitting is carried out by vetted teams under S&K's direction.
- Smoke vents (AOV) in Bournemouth
- Smoke vents (AOV) in Christchurch
- Smoke vents (AOV) in Dorchester
- Smoke vents (AOV) in Ferndown
- Smoke vents (AOV) in Poole
- Smoke vents (AOV) in Weymouth
- Smoke vents (AOV) in Wimborne Minster
What we do on the day
- Old vent removed with the stairwell kept protected below
- Certified vent and actuator matched to the opening and controls
- Existing vent, actuator and upstand surveyed with the specialist
- Controls and backup power — We confirm the controls, detection and backup power are being dealt with by a specialist.
- Upstand and weathering — We check the upstand suits the new vent and that the roof around it is sound.
Rules that apply in England
A replacement smoke vent in England has to keep the free area and performance the building's fire strategy relies on, using a vent certified to BS EN 12101-2 with its actuator and backup power. We fit the vent and do the roof work; a smoke-control specialist connects and commissions the controls, and we confirm whether building control needs to be notified.
Common questions in Dorset
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

