Belfast guide prices
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Belfast
Looking at a property near Belfast but not quite in it? We work across BT1, BT2 and BT7 and outwards to Castlereagh, Newtownabbey and Lisburn. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Belfast.
Fit-only or supply and fit
Your unit or ours, the fitting standard is the same. For supply and fit we choose a new rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What the job includes
- Insulated upstand built square, level and to the maker's height
- Plasterboard reveals formed inside and left ready for skim or decoration
- Rooflight fitted, sealed and checked for even clearance on every side
- Which way the joists run — We check the direction and size of the joists before fixing the rooflight's position.
- Planning for your roof — We check whether the new rooflight falls within permitted development for your house and nation.
A typical installation day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a new rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes two to three days.
Planning, building control and Belfast
Northern Ireland's building regulations set a minimum of WER Band C or 1.6 W/m²K for rooflights and roof windows in existing homes, assessed under Technical Booklet F1. New openings involve trimming the roof structure, so expect a building control application. Many house rooflights don't need planning permission, but conservation areas and listed buildings are excluded, and side windows near a boundary have obscure-glazing rules. We confirm what applies.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around BT1 and we will come back with a quote or a survey date.
Common questions in Belfast
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
What if my roof opening is the wrong size for the rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Does a rooflight need building control approval?
In Northern Ireland a new opening alters the roof structure, so expect a building control application; confirm the position with your council, including for replacements. The new rooflight must meet WER Band C or 1.6 W/m²K. We confirm what applies before you commit.
Ask for a quote for your Belfast roof. Survey dates are offered based on fitter availability once you are happy with the price.

