What the job costs in Newtownards
Small fixed unit
Opening cut, joists trimmed, upstand built, roof covering made good, plasterboard reveals ready for decoration
Medium fixed unit
As the small unit, with a larger opening up to about 1 × 2 m and additional trimming
Large or opening unit
Bigger structural work or an electric opening unit
Guide ranges for supply & fit, including structure and making good; building control or warrant fees extra. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering BT23 and neighbouring districts
Jobs across BT23, BT19 and BT16 are part of our normal cover for Newtownards. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Bangor and Castlereagh are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
Fit-only or supply and fit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a new rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What the job includes
- Opening marked out, covering stripped back and the deck cut cleanly
- Joists or rafters trimmed with new timbers to carry the load around
- Roof membrane, felt or tiles made good and dressed up the upstand
- Warm or cold roof build-up — We find out whether the roof is insulated above or between the joists before designing the upstand.
- Upstand energy performance — We build the upstand to meet the energy limit for site-built upstands, not just to hold the rooflight up.
What happens on the day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a new rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in Northern Ireland
Northern Ireland has its own rules. Permitted development for rooflights on a house requires the unit to sit below the highest part of the roof, project no more than 15 cm where the slope faces a road, and stay at least half a metre from the ridge, eaves, party wall and verge. It doesn't apply in conservation areas or within the grounds of a listed building. For building control, structural roof alterations need an application, and rooflights must meet WER Band C or 1.6 W/m²K.
What to send for a quick quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around BT23 and we will come back with a quote or a survey date.
Common questions in Newtownards
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Get in touch with the details of your Newtownards property and we will explain what the job involves and what it costs.