Guide prices
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Hampstead and the districts around it, NW3, NW6 and NW5, all sit inside our working area. So does the ground between Hampstead and Kilburn (1 mile), and on towards Chalk Farm (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What the job includes
- Old units removed, with waste taken off site
- Kerbs checked and packed, adapted or rebuilt where needed
- New units fitted, sealed and weathered into the roof covering
- Fragile roofs and rooflights — We treat every rooflight and the roof around it as fragile until we have checked it.
- Energy limits for non-domestic roofs — We check new units against the energy limits for non-domestic buildings.
How a fitting day runs
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a commercial rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Regulations for Hampstead properties
On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around NW3 and we will come back with a quote or a survey date.
Common questions in Hampstead
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Will my new commercial rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Does commercial rooflight work need building control?
Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.
Planning a commercial rooflight in Hampstead? Tell us about the roof and we will come back with a clear price in writing.

