Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Flint · CH6 · Clwyd

Rooflight upstands & kerbs in Flint

Building an upstand in Flint starts with the rooflight's own drawing, not a standard size. The kerb has to match the unit's internal dimensions, stand high enough above the finished roof for water to run off, and be level or pitched as the maker asks. We set the timber out to those figures, check the diagonals, insulate and weather it. If the rooflight is not on site yet, send us its make and model so the kerb is built for it.

Guide price from £245 · Labour and materials, rooflight not included

Flint guide prices

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Flint and nearby

If you also own a property or a business unit in Deeside, Buckley or Hawarden, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and CH6, CH5 and CH8 sit comfortably within that pattern.

What the job includes

  • Kerb sized from the maker's drawing, internal and external dimensions both checked
  • Treated timber frame fixed down to the deck and joists
  • Roof membrane turned up, bonded and finished at the kerb top
  • Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.

A typical installation day

The fitters measure twice before cutting: the opening, the rooflight's kerb size and the finished roof level. The kerb is built, packed level or to the maker's fall, insulated and weathered into the roof covering. You are left with an upstand ready for the rooflight, and a note of the sizes it was built to.

Planning and building rules in Wales

For a Welsh home, start with where the house is. In a conservation area, National Park, AONB or World Heritage Site, a rooflight needs planning permission; outside those, permitted development usually covers one that projects 150 mm or less. Side-facing roof windows within 10.5 m of a boundary must be obscure-glazed and fixed. New openings need building regulations approval, and replacements we fit are notified with a building notice, as we are not registered with a competent person scheme. We confirm all of this for your address.

Details that speed up your quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, CH6 or nearby, confirms travel.

Common questions in Flint

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Do you cover Flint?

Yes. Fitters travel to addresses in Flint and the surrounding districts, including CH6. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.

Send a few photos and your CH6 postcode, and we will put together a written quote for the job.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Flint

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote