Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Deeside · CH5 · Clwyd

Rooflight upstands & kerbs in Deeside

Building an upstand in Deeside starts with the rooflight's own drawing, not a standard size. The kerb has to match the unit's internal dimensions, stand high enough above the finished roof for water to run off, and be level or pitched as the maker asks. We set the timber out to those figures, check the diagonals, insulate and weather it. If the rooflight is not on site yet, send us its make and model so the kerb is built for it.

Guide price from £245 · Labour and materials, rooflight not included

Guide prices in Deeside

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Covering Deeside means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in CH5, CH7 and CH4, and are happy to quote further out in Hawarden and Buckley. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.

What we do on the day

  • Roof membrane turned up, bonded and finished at the kerb top
  • Fall built into the kerb where the rooflight needs one
  • Height set above the finished roof to the maker's stated minimum
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.

How a fitting day runs

The fitters measure twice before cutting: the opening, the rooflight's kerb size and the finished roof level. The kerb is built, packed level or to the maker's fall, insulated and weathered into the roof covering. You are left with an upstand ready for the rooflight, and a note of the sizes it was built to.

Regulations for Deeside properties

For a Welsh home, start with where the house is. In a conservation area, National Park, AONB or World Heritage Site, a rooflight needs planning permission; outside those, permitted development usually covers one that projects 150 mm or less. Side-facing roof windows within 10.5 m of a boundary must be obscure-glazed and fixed. New openings need building regulations approval, and replacements we fit are notified with a building notice, as we are not registered with a competent person scheme. We confirm all of this for your address.

What to send for a quick quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CH5 and we will come back with a quote or a survey date.

Common questions in Deeside

Does a rooflight need building regulations approval?

In Wales a new opening generally needs building regulations approval. A replacement must be self-certified by a scheme-registered installer or covered by a building notice. We are not registered with a scheme, so replacements we fit go through a building notice, and the council's fee is shown on your quote.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Questions before you commit? Send them over with your Deeside postcode and we will answer them plainly, with a quote alongside.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Deeside

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote