Guide prices
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Newburn
Fitters travel to the job, so the address is what counts. In Newburn that means postcode districts NE15, NE40 and NE21, and the same teams can just as easily take on work in Blaydon-on-Tyne, about 2 miles away, or Whickham at roughly 4 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
On the day, we cover
- Certified vent and actuator matched to the opening and controls
- Old vent removed with the stairwell kept protected below
- New vent fitted, sealed and weathered into the roof
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
- Upstand and weathering — We check the upstand suits the new vent and that the roof around it is sound.
How a fitting day runs
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a smoke vent rooflight: one to two days per vent, weather permitting.
Do you need permission in Newburn?
A replacement smoke vent in England has to keep the free area and performance the building's fire strategy relies on, using a vent certified to BS EN 12101-2 with its actuator and backup power. We fit the vent and do the roof work; a smoke-control specialist connects and commissions the controls, and we confirm whether building control needs to be notified.
What to send for a quick quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around NE15 and we will come back with a quote or a survey date.
Common questions in Newburn
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
Does commercial rooflight work need building control?
Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.
Get in touch with the details of your Newburn property and we will explain what the job involves and what it costs.

