Guide prices in Tyne and Wear
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Tyne and Wear
From the larger towns to the smaller places in between, we take on rooflight fitting across Tyne and Wear. The process is the same for a terrace, a farmhouse extension or an industrial unit: details first, written quote second, fitting day third. Remote and island addresses in England, where they arise, are covered by arrangement, and we tell you that before quoting.
- Smoke vents (AOV) in Blaydon-on-Tyne
- Smoke vents (AOV) in Felling
- Smoke vents (AOV) in Gateshead
- Smoke vents (AOV) in Gosforth
- Smoke vents (AOV) in Hebburn
- Smoke vents (AOV) in Houghton-Le-Spring
- Smoke vents (AOV) in Jarrow
- Smoke vents (AOV) in Newburn
- Smoke vents (AOV) in Newcastle upon Tyne
- Smoke vents (AOV) in North Shields
- Smoke vents (AOV) in South Shields
- Smoke vents (AOV) in Sunderland
- Smoke vents (AOV) in Tynemouth
- Smoke vents (AOV) in Wallsend
- Smoke vents (AOV) in Washington
- Smoke vents (AOV) in Whickham
- Smoke vents (AOV) in Whitley Bay
What we do on the day
- Old vent removed with the stairwell kept protected below
- Upstand checked, adapted or rebuilt to the vent maker's drawing
- Commissioning and sign-off carried out by the specialist before handover
- Controls and backup power — We confirm the controls, detection and backup power are being dealt with by a specialist.
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
Rules that apply in England
In England, smoke vents for common stairs must be certified to BS EN 12101-2, provide the free area the fire strategy requires (Approved Document B calls for at least 1 m² at the top of a common stair), and have backup power. Smoke vents have their own energy limit, commonly 3.5 W/m²K. Controls and commissioning are handled by a smoke-control specialist, and building control is involved where the system changes.
Common questions in Tyne and Wear
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Does commercial rooflight work need building control?
Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.
What upstand height and roof pitch does smoke vent rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

