Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Hyde · SK14 · Greater Manchester

Smoke vent rooflight installation in Hyde

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any smoke vent rooflight in Hyde, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £3,595 · Supply & fit; controls and commissioning by a smoke-control specialist

Guide prices

Vent swap

£3,595 – £6,595including VAT at 20%

Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist

Vent with new controls

£5,745 – £9,595including VAT at 20%

Vent plus new control panel and detection, commissioned by a smoke-control specialist

Multiple vents

£9,595 – £17,995including VAT at 20%

Several stairwells or larger systems, priced from a survey

Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Hyde and the districts around it, SK14, SK16 and M34, all sit inside our working area. So does the ground between Hyde and Denton (2 miles), and on towards Dukinfield (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

Included in the work

  • Upstand checked, adapted or rebuilt to the vent maker's drawing
  • New vent fitted, sealed and weathered into the roof
  • Certified vent and actuator matched to the opening and controls
  • Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
  • Free area at the stair head — We check the free area the vent must provide before choosing a replacement.

How a fitting day runs

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a smoke vent rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Regulations for Hyde properties

In England, smoke vents for common stairs must be certified to BS EN 12101-2, provide the free area the fire strategy requires (Approved Document B calls for at least 1 m² at the top of a common stair), and have backup power. Smoke vents have their own energy limit, commonly 3.5 W/m²K. Controls and commissioning are handled by a smoke-control specialist, and building control is involved where the system changes.

Details that speed up your quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around SK14 and we will come back with a quote or a survey date.

Common questions in Hyde

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

How long does fitting take?

Fitting a smoke vent rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Tell us your postcode, SK14 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Smoke vents (AOV) in Hyde

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote