Dundee guide prices
Compact sliding
Motorised sliding unit for a stair or hatch opening
Standard sliding
Larger opening onto a roof terrace
Large sliding
Big spans, lifting gear and longer installs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Covering DD1 and neighbouring districts
Looking at a property near Dundee but not quite in it? We work across DD1, DD3 and DD4 and outwards to St Andrews, Arbroath and Perth. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Dundee.
Your sliding rooflights or ours
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sliding rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What the job includes
- Cable routed to the motor, ready for the electrician's final connection, quoted as a separate line
- Controls, sensors and any safety stop set up and tested
- Lifting plan for the unit, often with gear booked for the day
- What the glass slides over — We check the area the glass will cover when open before deciding where the unit goes.
- Weight and lifting — We plan the lift for a sliding rooflight before it is ordered.
From arrival to clean-up
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a sliding rooflight: one to two days, weather permitting.
Planning and building rules in Scotland
In Scotland, forming a new rooflight opening needs a building warrant from the council, because the roof is being altered. Replacing an existing rooflight complete with its frame doesn't need a warrant, but the new unit still has to meet the building standards, including the 1.6 W/m²K energy figure for windows and rooflights in alterations. Planning depends on the house and where it is: householder permitted development rights don't apply in conservation areas, and listed buildings need consent. We confirm this with you before quoting.
What to send for a quick quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around DD1 and we will come back with a quote or a survey date.
Common questions in Dundee
What upstand height and roof pitch does sliding rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Can you fit the sliding rooflight I bought online?
Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the builder's opening and the upstand height. The product warranty stays with the maker or seller, and our guarantee covers the fitting.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
For a free, no-obligation quote in Dundee, use the form or call us with the details of your roof.

