What the job costs in Perth
Compact sliding
Motorised sliding unit for a stair or hatch opening
Standard sliding
Larger opening onto a roof terrace
Large sliding
Big spans, lifting gear and longer installs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Areas around Perth we cover
Perth and the districts around it, PH2, PH1 and PH14, all sit inside our working area. So does the ground between Perth and Glenrothes (17 miles), and on towards Dundee (18 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What we check on a supplied unit
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a sliding rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
On the day, we cover
- Controls, sensors and any safety stop set up and tested
- Frame fixed and weathered with the membrane dressed up the kerb
- Cable routed to the motor, ready for the electrician's final connection, quoted as a separate line
- Guarding on the terrace — We look at how the roof terrace will be guarded before the rooflight is fitted.
- Power and safety stops — We confirm the power supply and the safety features before fitting day.
From arrival to clean-up
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a sliding rooflight: one to two days, weather permitting.
Planning, building warrants and Perth
If you live in Scotland, the key question is whether the job is new or a replacement. A new rooflight needs a building warrant. Swapping an old rooflight for a new one, frame included, doesn't, as long as the new unit meets the standards: the energy figure for new or replacement rooflights in alterations is 1.6 W/m²K. Conservation areas have no householder permitted development rights for roof alterations, and listed buildings need listed building consent.
Details that speed up your quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, PH2 or nearby, confirms travel.
Common questions in Perth
Does a rooflight need a building warrant?
In Scotland a new rooflight needs a building warrant from the council before work starts. Replacing a rooflight complete with its frame doesn't need a warrant, but the new unit must meet the building standards in full, including 1.6 W/m²K. We confirm which applies to your job before you commit.
What if my roof opening is the wrong size for the sliding rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Questions before you commit? Send them over with your Perth postcode and we will answer them plainly, with a quote alongside.