Guide prices in Somerset
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Somerset
From the larger towns to the smaller places in between, we take on rooflight fitting across Somerset. The process is the same for a terrace, a farmhouse extension or an industrial unit: details first, written quote second, fitting day third. Remote and island addresses in England, where they arise, are covered by arrangement, and we tell you that before quoting.
- Glass replacement in Bath
- Glass replacement in Bridgwater
- Glass replacement in Burnham-on-Sea
- Glass replacement in Clevedon
- Glass replacement in Frome
- Glass replacement in Keynsham
- Glass replacement in Nailsea
- Glass replacement in Portishead
- Glass replacement in Taunton
- Glass replacement in Weston-super-Mare
- Glass replacement in Yeovil
What's included
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- New glazing tapes, gaskets or sealant fitted to suit the frame
- Sealed unit ordered to match or improve on the original glass
- Weight and lifting — We plan how a heavy pane gets onto the roof and into the frame.
- Condensation or a failed seal — We confirm whether the mist is inside the sealed unit or on the room-side surface.
Rules that apply in England
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Common questions in Somerset
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.

