Guide prices in Scottish Borders
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Towns we list in Scottish Borders
From the larger towns to the smaller places in between, we take on rooflight fitting across Scottish Borders. The process is the same for a terrace, a farmhouse extension or an industrial unit: details first, written quote second, fitting day third. Remote and island addresses in Scotland, where they arise, are covered by arrangement, and we tell you that before quoting.
What's included
- Old glass taken out safely and removed from site
- Joints water tested and the glass cleaned inside and out
- Measuring visit to size the glass and identify its make-up
- Condensation or a failed seal — We confirm whether the mist is inside the sealed unit or on the room-side surface.
- Weight and lifting — We plan how a heavy pane gets onto the roof and into the frame.
Rules that apply in Scotland
If you live in Scotland, the key question is whether the job is new or a replacement. A new rooflight needs a building warrant. Swapping an old rooflight for a new one, frame included, doesn't, as long as the new unit meets the standards: the energy figure for new or replacement rooflights in alterations is 1.6 W/m²K. Conservation areas have no householder permitted development rights for roof alterations, and listed buildings need listed building consent.
Common questions in Scottish Borders
Is new glass or a new rooflight better value?
If the frame, gaskets and drainage are sound, new glass is usually the cheaper fix. If the frame is cracked, distorted or leaking at the kerb, a full replacement is better value. After the measuring visit we price both so you can compare.
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.

