Larne guide prices
Like-for-like dome
Old dome taken off, new multi-skin dome fixed to the sound existing kerb
Dome with kerb adaptor
New dome where the kerb needs an adaptor or packing
Upgrade to glass
Dome swapped for a double-glazed glass rooflight on the existing sound kerb, as in our replacement service
Guide ranges for supply & fit, per dome; building control notice fee extra on homes in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Larne and nearby
Covering Larne means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in BT40, BT38 and BT39, and are happy to quote further out in Carrickfergus and Newtownabbey. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
Already bought your unit?
There are two ways to do this. Supply and fit means we source a dome rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.
On the day, we cover
- Kerb top cleaned of old sealant, fixings and loose felt
- Kerb checked for rot, size and height before the new unit goes on
- Old dome unscrewed, lifted off and taken away
- Is the kerb sound? — We check each kerb for rot and movement before quoting a dome swap.
- Multi-skin domes and energy — We fit multi-skin domes rather than single-skin ones as replacements.
How a fitting day runs
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a dome rooflight: a few hours per dome, weather permitting.
Do you need permission in Larne?
For a home in Northern Ireland, check planning first: rooflights are excluded from permitted development in conservation areas and within the curtilage of listed buildings, and elsewhere must keep 0.5 m clear of the ridge, eaves and verges. Then building control: a new opening alters the roof structure, so expect a building control application and confirm with your council, and the glazing must achieve WER Band C or 1.6 W/m²K. We check both for your address before quoting.
Getting a price from photos
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in BT40, and we can price it.
Common questions in Larne
What upstand height and roof pitch does dome rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Do I need planning permission for a rooflight in Larne?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Northern Ireland. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Questions before you commit? Send them over with your Larne postcode and we will answer them plainly, with a quote alongside.

