Guide prices
Small fixed
Double-glazed fixed unit up to 1000 × 1000 mm, fitted to a ready upstand
Medium fixed
1000 × 1500 to 1000 × 2000 mm, double or triple glazed
Large fixed
Bigger units, solar-control glass, two-person lift or lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering BT40 and neighbouring districts
Distance is rarely the deciding factor. A roof in Carrickfergus, 9 miles from Larne, gets the same survey, the same written quote and the same fitting process as one in BT40, BT38 and BT39. What changes the price is the job itself: size of unit, roof type, access and lifting. Newtownabbey, around 14 miles out, is treated the same way.
Your flat rooflights or ours
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a flat rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What the job includes
- Lifting gear or extra hands arranged for large and heavy panes
- Upstand checked or built to the maker's internal and external sizes
- Unit bedded on the specified sealant or tape and screw-fixed
- Pitch of the glass — We make sure the glass will sit at the pitch its maker asks for.
- Fixed or opening — We ask whether you need ventilation before you settle on a fixed unit.
A typical installation day
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a flat rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Planning, building control and Larne
For a home in Northern Ireland, check planning first: rooflights are excluded from permitted development in conservation areas and within the curtilage of listed buildings, and elsewhere must keep 0.5 m clear of the ridge, eaves and verges. Then building control: a new opening alters the roof structure, so expect a building control application and confirm with your council, and the glazing must achieve WER Band C or 1.6 W/m²K. We check both for your address before quoting.
Getting a price from photos
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, BT40 or nearby, confirms travel.
Common questions in Larne
What upstand height and roof pitch does flat rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Get in touch with the details of your Larne property and we will explain what the job involves and what it costs.

