Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Dover · CT17 · Kent

Commercial rooflight installation in Dover

Builders and extension firms in Dover often want the rooflight stage of a project handled by a specialist fitting team. We step in once the roof deck or battens are ready, fit a commercial rooflight on your upstand or ours, detail it into the membrane or tiles, and leave the opening ready for the plasterer. Homeowners get exactly the same service directly. In each case the job is quoted in writing first, with any access or lifting needs spelt out. Jobs around CT17 and the neighbouring districts are welcome.

Guide price from £1,095 · Supply & fit, per unit; site set-up priced separately

Dover guide prices

Per standard unit

£1,095 – £1,895including VAT at 20%

Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job

Per large unit

£1,895 – £3,345including VAT at 20%

Larger or ventilating units, edge protection in place

Programme of works

£3,345 – £7,195including VAT at 20%

Phased replacement across a building, priced from a survey

Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around Dover

Covering Dover means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in CT17, CT16 and CT15, and are happy to quote further out in Folkestone and Deal. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.

What the job includes

  • New units fitted, sealed and weathered into the roof covering
  • Unit schedule and handover notes for the building's records
  • Old units removed, with waste taken off site
  • Glass or polycarbonate — We compare glass and polycarbonate units against the roof, use and budget.
  • Working around occupied buildings — We plan noise, dust and access around the people using the building.

How a fitting day runs

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a commercial rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Planning and building rules in England

On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.

Getting a price from photos

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CT17 and we will come back with a quote or a survey date.

Common questions in Dover

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

What if my roof opening is the wrong size for the commercial rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Will my new commercial rooflight leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Send a few photos and your CT17 postcode, and we will put together a written quote for the job.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Commercial rooflights in Dover

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote