Guide prices
About 1 × 2 m
Aluminium lantern, double glazed, fitted and glazed on a ready upstand
About 1.5 × 3 m
Mid-size lantern, solar-control glass options
2 × 4 m and over
Large lanterns, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Our fitters come to you. For Dover that covers CT17, CT16 and CT15, plus nearby Folkestone and Deal. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
What we check on a supplied unit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
Included in the work
- Internal trims fitted to the ring beam or upstand
- Frame assembled on the kerb in the maker's set order
- Caps, end closures and ridge trims fitted and sealed
- Heat and glare — We talk through the glass options before you order a large lantern.
- Level, not to a fall — We set or check the kerb level unless your lantern's maker says otherwise.
How a fitting day runs
Where a job takes one to two days, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a roof lantern is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning and building rules in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
What to send for a quick quote
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, CT17 or a neighbouring district.
Common questions in Dover
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Tell us your postcode, CT17 or close by, and what you want fitted. We will reply with the next steps and a quote.