Guide prices in Harrow
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Harrow we cover
Fitters travel to the job, so the address is what counts. In Harrow that means postcode districts HA1, HA3 and HA2, and the same teams can just as easily take on work in Wealdstone, about 1 mile away, or Brent at roughly 2 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Included in the work
- Access, edge protection and fragile-roof covers planned before work starts
- Old units removed, with waste taken off site
- New units fitted, sealed and weathered into the roof covering
- Working around occupied buildings — We plan noise, dust and access around the people using the building.
- Glass or polycarbonate — We compare glass and polycarbonate units against the roof, use and budget.
Fitting your commercial rooflight, step by step
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a commercial rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Regulations for Harrow properties
On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.
Details that speed up your quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around HA1 and we will come back with a quote or a survey date.
Common questions in Harrow
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Will my new commercial rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
What upstand height and roof pitch does commercial rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Ask for a quote for your Harrow roof. Survey dates are offered based on fitter availability once you are happy with the price.