Guide prices
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
If you also own a property or a business unit in Woodford Green, Ponders End or Edmonton, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and E4, IG8 and N9 sit comfortably within that pattern.
On the day, we cover
- Phasing agreed so occupied areas stay dry and usable
- Old units removed, with waste taken off site
- Kerbs checked and packed, adapted or rebuilt where needed
- Glass or polycarbonate — We compare glass and polycarbonate units against the roof, use and budget.
- Fragile roofs and rooflights — We treat every rooflight and the roof around it as fragile until we have checked it.
From arrival to clean-up
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a commercial rooflight: about a day per unit, longer on big roofs, weather permitting.
Do you need permission in Chingford?
For non-domestic roofs in England, expect building control involvement for new openings, energy limits of 2.2 W/m²K for rooflights, and fire checks where rooflights sit near a boundary or above an escape route. Smoke ventilation rooflights must be certified products, with controls commissioned by a specialist. We set out what applies to your building on the quote.
Getting a price from photos
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around E4 and we will come back with a quote or a survey date.
Common questions in Chingford
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Do you cover Chingford?
Yes. Fitters travel to addresses in Chingford and the surrounding districts, including E4. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Questions before you commit? Send them over with your Chingford postcode and we will answer them plainly, with a quote alongside.

