Guide prices
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Fitters travel to the job, so the address is what counts. In South Shields that means postcode districts NE33, NE29 and NE30, and the same teams can just as easily take on work in Tynemouth, about 1 mile away, or North Shields at roughly 1 mile. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Fit-only or supply and fit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
On the day, we cover
- Engineer's calculations and the unit's loading data checked together
- Perimeter joints sealed and the waterproofing lapped as the maker shows
- Support frame or upstand prepared to the approved structural design
- Structural calculations — We need structural calculations for the glass and its support before a walk-on job goes ahead.
- Units tested to old standards — We check which standard the walk-on unit has been tested to.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a walk-on rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.
Regulations for South Shields properties
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Getting a price from photos
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around NE33. That is enough for a first price.
Common questions in South Shields
Do you cover South Shields?
Yes. Fitters travel to addresses in South Shields and the surrounding districts, including NE33. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
For a free, no-obligation quote in South Shields, use the form or call us with the details of your roof.