Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
South Shields · NE33 · Tyne and Wear

Roof lantern installation in South Shields

Builders and extension firms in South Shields often want the rooflight stage of a project handled by a specialist fitting team. We step in once the roof deck or battens are ready, fit a roof lantern on your upstand or ours, detail it into the membrane or tiles, and leave the opening ready for the plasterer. Homeowners get exactly the same service directly. In each case the job is quoted in writing first, with any access or lifting needs spelt out. Jobs around NE33 and the neighbouring districts are welcome.

Guide price from £3,095 · Supply & fit

What the job costs in South Shields

About 1 × 2 m

£3,095 – £4,545including VAT at 20%

Aluminium lantern, double glazed, fitted and glazed on a ready upstand

About 1.5 × 3 m

£4,545 – £7,195including VAT at 20%

Mid-size lantern, solar-control glass options

2 × 4 m and over

£7,195 – £11,395including VAT at 20%

Large lanterns, lifting gear on the day

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering NE33 and neighbouring districts

Fitters travel to the job, so the address is what counts. In South Shields that means postcode districts NE33, NE29 and NE30, and the same teams can just as easily take on work in Tynemouth, about 1 mile away, or North Shields at roughly 1 mile. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Already bought your unit?

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a roof lantern, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

What the job includes

  • Roof membrane checked where it meets the lantern frame
  • Glass cleaned and packaging cleared from the roof
  • Glass lifted and laid into the frame by hand or with gear
  • Upstand size and tolerance — We check the kerb against the lantern maker's figures before the kit is opened.
  • Following the build order — We assemble lanterns in exactly the sequence the instructions give.

From arrival to clean-up

Where a job takes one to two days, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a roof lantern is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Planning, building control and South Shields

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Getting a price from photos

A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, NE33 or a neighbouring district.

Common questions in South Shields

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Will my new roof lantern leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

What upstand height and roof pitch does roof lantern fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

Tell us your postcode, NE33 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Roof lanterns in South Shields

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote