Guide prices
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Newtownards
Looking at a property near Newtownards but not quite in it? We work across BT23, BT19 and BT16 and outwards to Bangor, Castlereagh and Belfast. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Newtownards.
Your walk-on rooflights or ours
Your unit or ours, the fitting standard is the same. For supply and fit we choose a walk-on rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Perimeter joints sealed and the waterproofing lapped as the maker shows
- Engineer's calculations and the unit's loading data checked together
- Protective film removed and the anti-slip surface left clean
- Non-fragile is not walk-on — We make sure the unit is genuinely designed for foot traffic.
- Drainage around the glass — We check how water will drain from the terrace around the unit.
From arrival to clean-up
Where a job takes one to two days, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a walk-on rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning and building rules in Northern Ireland
In Northern Ireland, the energy standard for a new or replacement rooflight or roof window in an existing home is WER Band C or a U-value of 1.6 W/m²K, under Technical Booklet F1. Cutting a new opening alters the roof structure, so a building control application is expected; confirm with the council's building control team. Planning permitted development covers many rooflights on houses if they stay below the ridge, project no more than 15 cm on a road-facing slope and sit at least 0.5 m from the ridge, eaves and verges.
Before you get in touch
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in BT23, and we can price it.
Common questions in Newtownards
Will my new walk-on rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
What upstand height and roof pitch does walk-on rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Questions before you commit? Send them over with your Newtownards postcode and we will answer them plainly, with a quote alongside.

