Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Sheffield · S1 · South Yorkshire

Rooflight upstands & kerbs in Sheffield

Replacing an old dome or a failed rooflight often means the kerb underneath has to change too: it may be rotten, too low for the new unit or the wrong size. We strip back what is needed, build a new upstand in Sheffield to the new unit's dimensions, insulate it and dress the roof covering up to it. Where only part of the kerb has failed, we say so and price the smaller repair. The scope is set out in a written quote before work starts.

Guide price from £245 · Labour and materials, rooflight not included

Guide prices

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Looking at a property near Sheffield but not quite in it? We work across S1, S3 and S2 and outwards to Fulwood, Rotherham and Dronfield. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Sheffield.

What the job includes

  • Insulation fitted to the upstand faces to limit heat loss
  • Roof membrane turned up, bonded and finished at the kerb top
  • Kerb sized from the maker's drawing, internal and external dimensions both checked
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.

Fitting your rooflight upstand, step by step

Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.

Planning, building control and Sheffield

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Before you get in touch

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, S1 or nearby, confirms travel.

Common questions in Sheffield

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Get in touch with the details of your Sheffield property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Sheffield

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote