Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Bridgwater · TA6 · Somerset

Rooflight upstands & kerbs in Bridgwater

Replacing an old dome or a failed rooflight often means the kerb underneath has to change too: it may be rotten, too low for the new unit or the wrong size. We strip back what is needed, build a new upstand in Bridgwater to the new unit's dimensions, insulate it and dress the roof covering up to it. Where only part of the kerb has failed, we say so and price the smaller repair. The scope is set out in a written quote before work starts.

Guide price from £245 · Labour and materials, rooflight not included

Bridgwater guide prices

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Bridgwater and the districts around it, TA6, TA7 and TA5, all sit inside our working area. So does the ground between Bridgwater and Burnham-on-Sea (8 miles), and on towards Taunton (9 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

Included in the work

  • Insulation fitted to the upstand faces to limit heat loss
  • Diagonals measured so the kerb is square before anything sits on it
  • Treated timber frame fixed down to the deck and joists
  • Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.

Fitting your rooflight upstand, step by step

The fitters measure twice before cutting: the opening, the rooflight's kerb size and the finished roof level. The kerb is built, packed level or to the maker's fall, insulated and weathered into the roof covering. You are left with an upstand ready for the rooflight, and a note of the sizes it was built to.

Do you need permission in Bridgwater?

England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, TA6 or nearby, confirms travel.

Common questions in Bridgwater

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Tell us your postcode, TA6 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Bridgwater

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote