What the job costs in Market Harborough
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering LE16 and neighbouring districts
Our fitters come to you. For Market Harborough that covers LE16, NN18 and NN16, plus nearby Corby and Kettering. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
What the job includes
- Roof membrane turned up, bonded and finished at the kerb top
- Fall built into the kerb where the rooflight needs one
- Treated timber frame fixed down to the deck and joists
- Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
- Size tolerance on the kerb — We build kerbs to a tight tolerance because rooflight glass is made to order and cannot be trimmed on site.
From arrival to clean-up
On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.
Do you need permission in Market Harborough?
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
What to send for a quick quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, LE16 or nearby, confirms travel.
Common questions in Market Harborough
Do I need planning permission for a rooflight in Market Harborough?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Get in touch with the details of your Market Harborough property and we will explain what the job involves and what it costs.