Wigston Magna guide prices
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Fitters travel to the job, so the address is what counts. In Wigston Magna that means postcode districts LE18, LE8 and LE2, and the same teams can just as easily take on work in Evington, about 2 miles away, or Oadby at roughly 2 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
On the day, we cover
- Treated timber frame fixed down to the deck and joists
- Height set above the finished roof to the maker's stated minimum
- Fall built into the kerb where the rooflight needs one
- Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
- Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
From arrival to clean-up
On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.
Regulations for Wigston Magna properties
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Details that speed up your quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, LE18 or nearby, confirms travel.
Common questions in Wigston Magna
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.