Guide prices in Daventry
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Daventry and nearby
Distance is rarely the deciding factor. A roof in Rugby, 9 miles from Daventry, gets the same survey, the same written quote and the same fitting process as one in NN11, NN5 and NN6. What changes the price is the job itself: size of unit, roof type, access and lifting. Northampton, around 12 miles out, is treated the same way.
On the day, we cover
- Insulation fitted to the upstand faces to limit heat loss
- Height set above the finished roof to the maker's stated minimum
- Fall built into the kerb where the rooflight needs one
- Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
- Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.
From arrival to clean-up
The fitters measure twice before cutting: the opening, the rooflight's kerb size and the finished roof level. The kerb is built, packed level or to the maker's fall, insulated and weathered into the roof covering. You are left with an upstand ready for the rooflight, and a note of the sizes it was built to.
Regulations for Daventry properties
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
What to send for a quick quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, NN11 or nearby, confirms travel.
Common questions in Daventry
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Do you cover Daventry?
Yes. Fitters travel to addresses in Daventry and the surrounding districts, including NN11. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Get in touch with the details of your Daventry property and we will explain what the job involves and what it costs.