Rooflight upstands & kerbs in Chorley

Building an upstand in Chorley starts with the rooflight's own drawing, not a standard size. The kerb has to match the unit's internal dimensions, stand high enough above the finished roof for water to run off, and be level or pitched as the maker asks. We set the timber out to those figures, check the diagonals, insulate and weather it. If the rooflight is not on site yet, send us its make and model so the kerb is built for it.

Guide price from £245 · Labour and materials, rooflight not included

Guide prices in Chorley

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Looking at a property near Chorley but not quite in it? We work across PR6, PR7 and PR25 and outwards to Horwich, Leyland and Darwen. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Chorley.

What the job includes

  • Roof membrane turned up, bonded and finished at the kerb top
  • Insulation fitted to the upstand faces to limit heat loss
  • Diagonals measured so the kerb is square before anything sits on it
  • Size tolerance on the kerb — We build kerbs to a tight tolerance because rooflight glass is made to order and cannot be trimmed on site.
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.

What happens on the day

Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.

Planning and building rules in England

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Before you get in touch

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around PR6 and we will come back with a quote or a survey date.

Common questions in Chorley

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

Questions before you commit? Send them over with your Chorley postcode and we will answer them plainly, with a quote alongside.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Chorley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote