Replacing an old dome or a failed rooflight often means the kerb underneath has to change too: it may be rotten, too low for the new unit or the wrong size. We strip back what is needed, build a new upstand in Limehouse to the new unit's dimensions, insulate it and dress the roof covering up to it. Where only part of the kerb has failed, we say so and price the smaller repair. The scope is set out in a written quote before work starts.

Guide price from £245 · Labour and materials, rooflight not included

Guide prices in Limehouse

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Looking at a property near Limehouse but not quite in it? We work across E14, E3 and E1 and outwards to Stepney, Canary Wharf and Bow. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Limehouse.

Included in the work

  • Treated timber frame fixed down to the deck and joists
  • Diagonals measured so the kerb is square before anything sits on it
  • Fall built into the kerb where the rooflight needs one
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.

How a fitting day runs

The fitters measure twice before cutting: the opening, the rooflight's kerb size and the finished roof level. The kerb is built, packed level or to the maker's fall, insulated and weathered into the roof covering. You are left with an upstand ready for the rooflight, and a note of the sizes it was built to.

Regulations for Limehouse properties

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Details that speed up your quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around E14 and we will come back with a quote or a survey date.

Common questions in Limehouse

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Get in touch with the details of your Limehouse property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Limehouse

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote