Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Highgate · N6 · Greater London

Rooflight upstands & kerbs in Highgate

A kerb that is a few millimetres out of square, or a little too low once the roof covering goes on, can stop a rooflight sealing properly. That is why upstand work in Highgate starts with measuring the opening, the roof build-up and the unit's kerb size together. The upstand is then built from treated timber, insulated and weathered into the membrane, felt or fibreglass. You get a written quote first and a note of the sizes it was built to.

Guide price from £245 · Labour and materials, rooflight not included

What the job costs in Highgate

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Areas around Highgate we cover

Distance is rarely the deciding factor. A roof in Archway, 1 mile from Highgate, gets the same survey, the same written quote and the same fitting process as one in N6, N19 and NW5. What changes the price is the job itself: size of unit, roof type, access and lifting. Muswell Hill, around 1 mile out, is treated the same way.

What we do on the day

  • Fall built into the kerb where the rooflight needs one
  • Treated timber frame fixed down to the deck and joists
  • Roof membrane turned up, bonded and finished at the kerb top
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.
  • Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.

From arrival to clean-up

On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.

Do you need permission in Highgate?

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

What to send for a quick quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, N6 or nearby, confirms travel.

Common questions in Highgate

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Tell us your postcode, N6 or close by, and what you want fitted. We will reply with the next steps and a quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Highgate

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote