Replacing an old dome or a failed rooflight often means the kerb underneath has to change too: it may be rotten, too low for the new unit or the wrong size. We strip back what is needed, build a new upstand in Chalk Farm to the new unit's dimensions, insulate it and dress the roof covering up to it. Where only part of the kerb has failed, we say so and price the smaller repair. The scope is set out in a written quote before work starts.

Guide price from £245 · Labour and materials, rooflight not included

What the job costs in Chalk Farm

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering NW5 and neighbouring districts

Distance is rarely the deciding factor. A roof in Camden Town, 1 mile from Chalk Farm, gets the same survey, the same written quote and the same fitting process as one in NW5, NW1 and NW3. What changes the price is the job itself: size of unit, roof type, access and lifting. Holloway, around 1 mile out, is treated the same way.

On the day, we cover

  • Fall built into the kerb where the rooflight needs one
  • Treated timber frame fixed down to the deck and joists
  • Height set above the finished roof to the maker's stated minimum
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.

What happens on the day

Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.

Planning and building rules in England

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Before you get in touch

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around NW5 and we will come back with a quote or a survey date.

Common questions in Chalk Farm

Do I need planning permission for a rooflight in Chalk Farm?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Get in touch with the details of your Chalk Farm property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Chalk Farm

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote