Guide prices in Coleraine
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Coleraine and nearby
Our fitters come to you. For Coleraine that covers BT52, BT55 and BT56, plus nearby Ballymena and Derry/Londonderry. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
What we do on the day
- Roof membrane turned up, bonded and finished at the kerb top
- Insulation fitted to the upstand faces to limit heat loss
- Kerb sized from the maker's drawing, internal and external dimensions both checked
- Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
- Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.
What happens on the day
The fitters measure twice before cutting: the opening, the rooflight's kerb size and the finished roof level. The kerb is built, packed level or to the maker's fall, insulated and weathered into the roof covering. You are left with an upstand ready for the rooflight, and a note of the sizes it was built to.
Planning, building control and Coleraine
In Northern Ireland, the energy standard for a new or replacement rooflight or roof window in an existing home is WER Band C or a U-value of 1.6 W/m²K, under Technical Booklet F1. Cutting a new opening alters the roof structure, so a building control application is expected; confirm with the council's building control team. Planning permitted development covers many rooflights on houses if they stay below the ridge, project no more than 15 cm on a road-facing slope and sit at least 0.5 m from the ridge, eaves and verges.
Details that speed up your quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around BT52 and we will come back with a quote or a survey date.
Common questions in Coleraine
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Do I need planning permission for a rooflight in Coleraine?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Northern Ireland. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Ask for a quote for your Coleraine roof. Survey dates are offered based on fitter availability once you are happy with the price.