Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Oban · PA34 · Argyll & Bute

Rooflight upstands & kerbs in Oban

Replacing an old dome or a failed rooflight often means the kerb underneath has to change too: it may be rotten, too low for the new unit or the wrong size. We strip back what is needed, build a new upstand in Oban to the new unit's dimensions, insulate it and dress the roof covering up to it. Where only part of the kerb has failed, we say so and price the smaller repair. The scope is set out in a written quote before work starts.

Guide price from £245 · Labour and materials, rooflight not included · Covered by arrangement

What the job costs in Oban

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.

Coverage by arrangement

Oban is covered by arrangement. Tell us the address and we will confirm travel, dates and any ferry or accommodation costs before quoting. Many island and remote jobs can be priced from photos first, so nobody travels until the scope is clear.

Included in the work

  • Treated timber frame fixed down to the deck and joists
  • Kerb sized from the maker's drawing, internal and external dimensions both checked
  • Diagonals measured so the kerb is square before anything sits on it
  • Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.

A typical installation day

Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.

Regulations for Oban properties

If you live in Scotland, the key question is whether the job is new or a replacement. A new rooflight needs a building warrant. Swapping an old rooflight for a new one, frame included, doesn't, as long as the new unit meets the standards: the energy figure for new or replacement rooflights in alterations is 1.6 W/m²K. Conservation areas have no householder permitted development rights for roof alterations, and listed buildings need listed building consent.

What to send for a quick quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, PA34 or nearby, confirms travel.

Common questions in Oban

Can you fit a rooflight in winter or when it is raining?

Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

Do you cover Oban?

By arrangement. Oban is one of the island or remote locations we take on case by case. Send the address, photos and sizes; we confirm travel, dates and any ferry or accommodation costs in the written quote before you commit.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Get in touch with the details of your Oban property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Oban

Send photos and rough sizes first. Island and remote surveys are arranged case by case, and you get one fixed written price before anything starts.

CallGet a quote