Guide prices in Oban
Small frameless
Up to about 1000 × 1000 mm, hidden frame inside the upstand
Medium frameless
Up to about 1000 × 2000 mm
Large frameless
Large single panes, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Coverage by arrangement
Oban is covered by arrangement. Tell us the address and we will confirm travel, dates and any ferry or accommodation costs before quoting. Many island and remote jobs can be priced from photos first, so nobody travels until the scope is clear.
Buying your own, or letting us supply
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a frameless rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
On the day, we cover
- Kerb squared across the diagonals before the glass is ordered or fitted
- Roof covering turned up and finished under the glass overhang
- Glass bedded on the specified tape or sealant and fixed through the concealed frame
- Tolerance on the upstand — We build frameless kerbs to the maker's tolerance rather than to normal carpentry accuracy.
- Drainage at the overhang — We check how water leaves the glass where it oversails the kerb.
From arrival to clean-up
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A frameless rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one day.
Do you need permission in Oban?
In Scotland a new rooflight needs a building warrant before work starts. A like-for-like replacement including the frame is exempt from a warrant but must meet current standards, so the glazing has to reach 1.6 W/m²K or better. For planning, rooflights on houses outside conservation areas can often go ahead under permitted development, but it is worth confirming with the planning authority.
Before you get in touch
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, PA34 or a neighbouring district.
Common questions in Oban
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Do I need planning permission for a rooflight in Oban?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Scotland. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Send a few photos and your PA34 postcode, and we will put together a written quote for the job.