Sheffield guide prices
Per flat rooflight
Fit a supplied unit to your prepared upstand, sealed and trimmed
Per roof lantern
Assemble and glaze a supplied lantern on your upstand
Two-person day rate
Fitting team for multi-unit or mixed work
Guide ranges for labour only, ex VAT for trade accounts. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering S1 and neighbouring districts
Jobs across S1, S3 and S2 are part of our normal cover for Sheffield. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Fulwood and Rotherham are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
On the day, we cover
- Upstands checked for size, height, level and square
- A short note of anything we found that needs your attention
- Supplied units checked against your schedule before fitting
- Upstand ready and to size — We ask for the upstands to be built to the maker's drawing before we arrive.
- Programme and access — We confirm site access, lifting arrangements and working hours before the visit.
How a fitting day runs
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes half a day to a day per unit.
Regulations for Sheffield properties
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we agree up front who notifies it. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around S1 and we will come back with a quote or a survey date.
Common questions in Sheffield
Do you cover Sheffield?
Yes. Fitters travel to addresses in Sheffield and the surrounding districts, including S1. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Builders and roofers in Sheffield: send the spec and the site address for a written trade price.