Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Newtown · SY16 · Powys

Sun tunnel installation in Newtown

Plenty of rooflight trouble starts with a tape measure. Units are often sold by the builder's opening, meaning the hole in the roof, rather than the overall external size, and confusing the two leaves you with a frame that does not suit the opening. Before we fit any sun tunnel in Newtown, we measure the opening, the upstand or kerb where there is one, and the finished roof level, then compare them with the maker's drawing. If something is out, you hear about it before the fitting day rather than on it. That single check keeps most jobs like this on track.

Guide price from £595 · Supply & fit

What the job costs in Newtown

Short rigid tube

£595 – £845including VAT at 20%

Around 250 mm tube, short straight run through a loft

Wider or longer run

£845 – £1,145including VAT at 20%

Around 350 mm tube or longer runs with bends

Flat roof or complex

£1,145 – £1,745including VAT at 20%

Flat roof kits, long runs or two tubes

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering SY16 and neighbouring districts

Fitters travel to the job, so the address is what counts. In Newtown that means postcode districts SY16, SY17 and SY15, and the same teams can just as easily take on work in Welshpool, about 12 miles away, or Llandrindod Wells at roughly 19 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Buying your own, or letting us supply

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sun tunnel, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

Included in the work

  • Dust cleared from the room below and the loft
  • Ceiling opening cut neatly and the diffuser fitted
  • Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
  • Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.
  • Condensation in cold lofts — We insulate the tube where it passes through a cold loft.

Fitting your sun tunnel, step by step

On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a sun tunnel, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.

Planning, building control and Newtown

Wales sets energy limits of 2.2 W/m²K for rooflights and 1.4 W/m²K for roof windows, and new rooflight openings generally need building regulations approval. Replacement units are controlled fittings; we are not registered with a competent person scheme, so ours are covered by a building notice to the council. Planning permission is needed for rooflights in conservation areas, National Parks, AONBs and World Heritage Sites. We check which applies and include the fee in your quote.

What to send for a quick quote

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as SY16.

Common questions in Newtown

Can you fit a rooflight in winter or when it is raining?

Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

Will my new sun tunnel leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Got a unit waiting to go in, or need one sourced? Either way, start with your Newtown address and a couple of photos.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sun tunnels in Newtown

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote