What the job costs in Wrexham
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering LL13 and neighbouring districts
Our fitters come to you. For Wrexham that covers LL13, LL11 and LL12, plus nearby Brymbo and Rhosllannerchrugog. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Your sun tunnels or ours
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sun tunnel, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Rigid or flexible tube run and joined, with as few bends as possible
- Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
- Route through the loft checked for joists, cables and pipes
- Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.
- Tube size — We match the tube size to the room and the roof.
Fitting your sun tunnel, step by step
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a sun tunnel: half a day to a day, weather permitting.
Planning and building rules in Wales
Welsh rules differ from England's in one important way: rooflights lose permitted development rights in conservation areas, National Parks, AONBs and World Heritage Sites. Elsewhere on a house, a rooflight that projects no more than 150 mm and stays below the highest part of the roof is usually fine. Building regulations still apply to new openings, replacements we fit go through a building notice because we are not scheme-registered, and the energy limit for rooflights is 2.2 W/m²K. A new Welsh Approved Document L takes effect on 4 March 2027.
Details that speed up your quote
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in LL13, and we can price it.
Common questions in Wrexham
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Questions before you commit? Send them over with your Wrexham postcode and we will answer them plainly, with a quote alongside.

