Guide prices in Perth
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Is your address covered?
Fitters travel to the job, so the address is what counts. In Perth that means postcode districts PH2, PH1 and PH14, and the same teams can just as easily take on work in Glenrothes, about 17 miles away, or Dundee at roughly 18 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Fit-only or supply and fit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
What the job includes
- Route through the loft checked for joists, cables and pipes
- Rigid or flexible tube run and joined, with as few bends as possible
- Dust cleared from the room below and the loft
- Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.
- Length and bends in the tube — We plan the shortest, straightest route we can between the roof and the ceiling.
How a fitting day runs
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a sun tunnel: half a day to a day, weather permitting.
Do you need permission in Perth?
For Scottish homes: building warrant for new rooflight openings; no warrant for replacing a rooflight complete with its frame, provided it meets the standards, including 1.6 W/m²K; planning permission in conservation areas and listed building consent for listed properties. Outside those, permitted development usually covers house rooflights, but the planning authority has the final word, so we check before you commit.
Getting a price from photos
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around PH2. That is enough for a first price.
Common questions in Perth
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
How long does fitting take?
Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Get in touch with the details of your Perth property and we will explain what the job involves and what it costs.