Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Lancashire · England

Sun tunnel installation in Lancashire

Rooflight fitting in Lancashire is planned around dry spells, not just calendar dates. That matters more than people think: membranes and sealants need a dry surface, and a roof should not be left open in poor weather. So when we offer a date for sun tunnel installation, it comes with a sensible fallback. We take jobs across all 40 postcode districts in Lancashire, and the written quote sets out what is included before you commit.

Guide prices in Lancashire

Short rigid tube

£595 – £845including VAT at 20%

Around 250 mm tube, short straight run through a loft

Wider or longer run

£845 – £1,145including VAT at 20%

Around 350 mm tube or longer runs with bends

Flat roof or complex

£1,145 – £1,745including VAT at 20%

Flat roof kits, long runs or two tubes

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Towns we list in Lancashire

Coverage in Lancashire works by postcode, not by distance from an office. Give us the full postcode and we will confirm whether it is standard cover, as it is for most of England, or one of the few remote and island areas handled by arrangement. Either way, you get a written quote before any work is booked, with travel included in the price.

What we do on the day

  • Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
  • Rigid or flexible tube run and joined, with as few bends as possible
  • Dome fixed and sealed on top of the flashing
  • Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.
  • Flat or pitched roof kit — We confirm the roof type and covering before ordering the kit.

Rules that apply in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Common questions in Lancashire

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

How long does fitting take?

Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Will my new sun tunnel leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Fitting in Lancashire

Send photos and rough sizes, or ask for a survey visit for install work. You get one fixed written price before anything starts.

CallGet a quote