What the job costs in Airdrie
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Covering ML6 and neighbouring districts
Our fitters come to you. For Airdrie that covers ML6, ML5 and ML4, plus nearby Coatbridge and Bellshill. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
What we check on a supplied unit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sun tunnel, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Rigid or flexible tube run and joined, with as few bends as possible
- Dome fixed and sealed on top of the flashing
- Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
- Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.
- Condensation in cold lofts — We insulate the tube where it passes through a cold loft.
From arrival to clean-up
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a sun tunnel: half a day to a day, weather permitting.
Regulations for Airdrie properties
If you live in Scotland, the key question is whether the job is new or a replacement. A new rooflight needs a building warrant. Swapping an old rooflight for a new one, frame included, doesn't, as long as the new unit meets the standards: the energy figure for new or replacement rooflights in alterations is 1.6 W/m²K. Conservation areas have no householder permitted development rights for roof alterations, and listed buildings need listed building consent.
Details that speed up your quote
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around ML6. That is enough for a first price.
Common questions in Airdrie
How long does fitting take?
Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you fit the sun tunnel I bought online?
Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the opening, the flashing kit and the roof pitch. The product warranty stays with the maker or seller, and our guarantee covers the fitting.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Got a unit waiting to go in, or need one sourced? Either way, start with your Airdrie address and a couple of photos.

