Airdrie guide prices
Small conservation unit
Low-profile unit with glazing bar, slate or tile flashing
Medium unit
Larger opening, lead or matching flashings
Large or bespoke
Larger or made-to-order units for listed or sensitive roofs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Coverage in and around Airdrie
If you also own a property or a business unit in Coatbridge, Bellshill or Motherwell, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and ML6, ML5 and ML4 sit comfortably within that pattern.
Already bought your unit?
Your unit or ours, the fitting standard is the same. For supply and fit we choose a conservation rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Rafters trimmed with timbers that suit the existing roof
- Slates or tiles lifted carefully and kept for reuse where possible
- Slates or tiles made good around the frame with tidy cuts
- Energy and old roofs — We make sure the rooflight meets current energy rules while suiting an older roof build-up.
- Listed building consent — We confirm listed building consent is in place before fitting any rooflight on a listed building.
Fitting your conservation rooflight, step by step
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A conservation rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one day.
Do you need permission in Airdrie?
For Scottish homes: building warrant for new rooflight openings; no warrant for replacing a rooflight complete with its frame, provided it meets the standards, including 1.6 W/m²K; planning permission in conservation areas and listed building consent for listed properties. Outside those, permitted development usually covers house rooflights, but the planning authority has the final word, so we check before you commit.
Before you get in touch
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, ML6 or a neighbouring district.
Common questions in Airdrie
Does a rooflight need a building warrant?
In Scotland a new rooflight needs a building warrant from the council before work starts. Replacing a rooflight complete with its frame doesn't need a warrant, but the new unit must meet the building standards in full, including 1.6 W/m²K. We confirm which applies to your job before you commit.
How long does fitting take?
Fitting a conservation rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.