Ryde guide prices
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Ryde and nearby
Ryde and the districts around it, PO33, PO34 and PO35, all sit inside our working area. So does the ground between Ryde and Sandown (5 miles), and on towards Newport (6 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Fit-only or supply and fit
There are two ways to do this. Supply and fit means we source a sun tunnel that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.
Included in the work
- Rigid or flexible tube run and joined, with as few bends as possible
- Ceiling opening cut neatly and the diffuser fitted
- Tube insulated where it passes through a cold loft
- Length and bends in the tube — We plan the shortest, straightest route we can between the roof and the ceiling.
- Flat or pitched roof kit — We confirm the roof type and covering before ordering the kit.
What happens on the day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a sun tunnel runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning, building control and Ryde
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
What to send for a quick quote
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, PO33 or a neighbouring district.
Common questions in Ryde
Do I need planning permission for a rooflight in Ryde?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Will my new sun tunnel leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
For a free, no-obligation quote in Ryde, use the form or call us with the details of your roof.