Guide prices
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
If you also own a property or a business unit in Sandown, Newport or Cowes, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and PO33, PO34 and PO35 sit comfortably within that pattern.
Buying your own, or letting us supply
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
What we do on the day
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Internal reveal trimmed or lined, with the protective film removed at the end
- Opening and upstand measured against the maker's drawing, timber to timber
- Warranty conditions on your unit — We read the warranty terms that came with your rooflight before we fit it.
- Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
From arrival to clean-up
Where a job takes half a day to a day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Do you need permission in Ryde?
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
What to send for a quick quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, PO33 or nearby, confirms travel.
Common questions in Ryde
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
What if my roof opening is the wrong size for the rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Questions before you commit? Send them over with your Ryde postcode and we will answer them plainly, with a quote alongside.