Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Bishops Stortford · CM23 · Hertfordshire

Sun tunnel installation in Bishops Stortford

Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Bishops Stortford is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every sun tunnel we install, from a new opening to a straight swap or a fit-only job. We cover Bishops Stortford, the CM23 district and the rest of Hertfordshire.

Guide price from £595 · Supply & fit

Guide prices

Short rigid tube

£595 – £845including VAT at 20%

Around 250 mm tube, short straight run through a loft

Wider or longer run

£845 – £1,145including VAT at 20%

Around 350 mm tube or longer runs with bends

Flat roof or complex

£1,145 – £1,745including VAT at 20%

Flat roof kits, long runs or two tubes

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering CM23 and neighbouring districts

Fitters travel to the job, so the address is what counts. In Bishops Stortford that means postcode districts CM23, CM21 and SG10, and the same teams can just as easily take on work in Harlow, about 7 miles away, or Ware at roughly 9 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Already bought your unit?

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sun tunnel, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

What the job includes

  • Tube insulated where it passes through a cold loft
  • Dome fixed and sealed on top of the flashing
  • Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
  • Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.
  • Tube size — We match the tube size to the room and the roof.

Fitting your sun tunnel, step by step

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sun tunnel level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes half a day to a day.

Regulations for Bishops Stortford properties

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

What to send for a quick quote

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as CM23.

Common questions in Bishops Stortford

How long does fitting take?

Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Questions before you commit? Send them over with your Bishops Stortford postcode and we will answer them plainly, with a quote alongside.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sun tunnels in Bishops Stortford

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote