What the job costs in Ware
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering SG12 and neighbouring districts
Distance is rarely the deciding factor. A roof in Hertford, 2 miles from Ware, gets the same survey, the same written quote and the same fitting process as one in SG12, SG13 and SG14. What changes the price is the job itself: size of unit, roof type, access and lifting. Hoddesdon, around 3 miles out, is treated the same way.
Already bought your unit?
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sun tunnel, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Tube insulated where it passes through a cold loft
- Dome fixed and sealed on top of the flashing
- Route through the loft checked for joists, cables and pipes
- Condensation in cold lofts — We insulate the tube where it passes through a cold loft.
- Tube size — We match the tube size to the room and the roof.
How a fitting day runs
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a sun tunnel, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Planning and building rules in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Getting a price from photos
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SG12 or nearby, confirms travel.
Common questions in Ware
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Questions before you commit? Send them over with your Ware postcode and we will answer them plainly, with a quote alongside.

