Guide prices in Renfrewshire & Inverclyde
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Towns we list in Renfrewshire & Inverclyde
Fitting across Renfrewshire & Inverclyde means planning routes, access and lifting as well as the roof itself. Narrow lanes, shared driveways and town-centre parking restrictions all affect how a large unit is delivered and raised to roof level. We ask about these early so the quote reflects them. That approach is the same everywhere we work in Scotland, from single domestic jobs to multi-unit commercial sites.
- Smoke vents (AOV) in Barrhead
- Smoke vents (AOV) in Erskine
- Smoke vents (AOV) in Greenock
- Smoke vents (AOV) in Johnstone
- Smoke vents (AOV) in Newton Mearns
- Smoke vents (AOV) in Paisley
- Smoke vents (AOV) in Renfrew
What the job includes
- Controls, detection and wiring handled by the smoke-control specialist
- Upstand checked, adapted or rebuilt to the vent maker's drawing
- Certified vent and actuator matched to the opening and controls
- Controls and backup power — We confirm the controls, detection and backup power are being dealt with by a specialist.
- Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
Rules that apply in Scotland
In Scotland, smoke ventilation is covered by the domestic or non-domestic Technical Handbook, depending on the building. Vents must be certified products, keep the required free area, and be connected and commissioned by a smoke-control specialist. A building warrant is needed where the system is altered.
Common questions in Renfrewshire & Inverclyde
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
What if my roof opening is the wrong size for the smoke vent rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

