Guide prices in Renfrewshire & Inverclyde
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Towns we list in Renfrewshire & Inverclyde
From the larger towns to the smaller places in between, we take on rooflight fitting across Renfrewshire & Inverclyde. The process is the same for a terrace, a farmhouse extension or an industrial unit: details first, written quote second, fitting day third. Remote and island addresses in Scotland, where they arise, are covered by arrangement, and we tell you that before quoting.
- Walk-on rooflights in Barrhead
- Walk-on rooflights in Erskine
- Walk-on rooflights in Greenock
- Walk-on rooflights in Johnstone
- Walk-on rooflights in Newton Mearns
- Walk-on rooflights in Paisley
- Walk-on rooflights in Renfrew
What the job includes
- Support frame or upstand prepared to the approved structural design
- Engineer's calculations and the unit's loading data checked together
- Unit bedded and fixed so it sits level with the finished surface
- Units tested to old standards — We check which standard the walk-on unit has been tested to.
- Drainage around the glass — We check how water will drain from the terrace around the unit.
Rules that apply in Scotland
In Scotland a new rooflight needs a building warrant before work starts. A like-for-like replacement including the frame is exempt from a warrant but must meet current standards, so the glazing has to reach 1.6 W/m²K or better. For planning, rooflights on houses outside conservation areas can often go ahead under permitted development, but it is worth confirming with the planning authority.
Common questions in Renfrewshire & Inverclyde
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
How long does fitting take?
Fitting a walk-on rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

